R-Project Public Comment

Public comment is being accepted on the supplemental EIS for the revised proposal to construct an industrial powerline through the Sandhills.

In addition to an introduction, the document is available at www.regulations.ov. Emi bynter docket number FWS-R6-ES-2014-0048. Scroll down the page and find the draft supplement document ( https://www.regulations.gov/document/FWS-R6-ES-2014-0048-0271) select it and a PDF document will be provided for review and consideration.

The Flatwater Free Press has prepared a story on the process underway ( https://flatwaterfreepress.org/power-play-project-to-move-power-through-nebraska-sandhills-has-stalled-for-12-years/) and featured area ranchers Lemoyne Dailey and Brett Stephen. Both strongly oppose the powerline project.

There have been a few other news reports. Further reporting occurred following the public hearkngs on February 27 at  North Platte and on the 29th at Broken Bow.

The public comment period ends April 9th, 2024.

Comments

Popular posts from this blog

Birding Atop the Sand Hilltops

Part of Historic Young Ranch Sold

Management Options Being Considered for Seier NWR